Fri, 4th Oct 2024 03:49 (GMT +7)

Cua Luc No.3 Bridge project almost accomplished

Thursday, 27/07/2023 | 16:13:17 [GMT +7] A  A

Having been launched since late 2020, Cua Luc No.3 Bridge project has currently been almosted completed. All of the constructors have been speeding up the progress to finish this project by September, 2023.

Cua Luc Bridge 3 crossing Dien Vong River (Cua Luc Bay) has a total length of 2.6km and 6 lanes. The first point connects the main road of FLC Urban Area at Ha Khanh ward and the ending point intersects the national highway No. 279 in Ha Long city.
Main items have been almost completed.
All of the constructors have been speeding up the progress to finish the project in September.

At the construction site of the leading road at Thong Nhat commune.
Constructing median strips

By Do Phuong