Being an important project in upgrading transport infrastructure in line with tourism growth in Ha Long City, currently, Bai Tho coastal ring-road is basically complete. The contractors have focused on implementing additional works, striving to finish before Aug. 30, 2019.
The starting point of the Bai Tho coastal ring-road expansion project is at Vincom Ha Long Trade Center and the ending point is Ben Doan Port.
The 1.2 km road is upgraded to 6 lanes from 4 lanes, ensuring the synchronous transport connection with the Tran Quoc Nghien coastal ring-road and Ha Long – Cam Pha coastal ring-road, thus meeting smooth traffic demand and contributing to tourism growth of the province.
Translated by Thu Giang